The map below shows the proposed layout of 105 wind turbines and potential options for connection for the existing 330,000 volt (orange) transmission line to the west of Lake Burrendong. Each wind turbine will require an access track and turbine lay-down area for construction, and will be connected by a combination of underground and overhead powerlines to a new on-site substation.